Chat with us, powered by LiveChat Assume the following project is being prepared for progress review at the end of the third quarter - Homeworkfixit

According to the budget baseline, all tasks should be completed except Task 8, which should be about 30% complete at this time. The project manager reports, however, that all tasks are completed except Task 8, which is only about 10% complete.

Required: Assuming that actual costs to date total $240,000, compute (formula with the result) and evaluate (in narrative form) the following:

a. BAC

b. BCWS (PV)

c. EV

d. AC

e. CV and CPI

f. SV and SPI

g. ETC and EAC

h. TCI.

· Write a paper of at least 1000 content words, typewritten in double-spaced format (12-point font Times New Roman), page margins Top, Bottom, Left Side and Right Side = 1 inch, including all pages, with reasonable accommodation being made for special situations and online submission variances.

· Show all work (math steps), including formula, result, and your analysis of the result. (See Appendix B in the text for example formulas.)

· Discuss, in general terms, a possible change to the project that could be made to hasten the completion of a task that is behind schedule, such as Task 8.

· Prepare this assignment according to the APA guidelines, including a title page, an introduction, and a conclusion. An abstract is not required. Cite in text and include a References section. A template is included in week 1.

· In your report, make certain that you include at least two outside references from scholarly sources (from the APUS Online Library)

· For full credit, make sure that your Similarity Index does not exceed 20%.

· In the Assignment dropbox, please attach your paper as a file, do not copy & paste. I will grade and return your file.